Nexans Umbilicals to Play Vital Role in Senegal’s First Offshore Oil Development - Wire & Cable India
Wire & Cable India
News

Nexans Umbilicals to Play Vital Role in Senegal’s First Offshore Oil Development

Nexans’ Halden facility will provide both static and dynamic umbilicals for each phase of the project, with deliveries commencing in 2022.

September 29, 2020

Nexans Umbilicals
Nexans will supply 46 kilometers of umbilicals

Nexans has signed a contract with Subsea 7 to design and manufacture 46km of umbilicals for the Sangomar field, offshore Senegal. The umbilicals, produced by Nexans’ specialized facility in Halden, Norway, will provide vital hydraulic, control and instrumentation services for a stand-alone floating production storage and offloading (FPSO) facility and associated subsea infrastructure.

Nexans will deliver 13,471m of dynamic umbilicals which will be installed from north to south. Nexans will also provide 9.503m of main static umbilicals, 8,719m of production infield umbilicals, and 14,650m of injection infield umbilicals in the subsequent four phases of development.

The Sangomar Field Development was discovered in 2014. Located 2km below the seabed floor, the field is spread over 400km², in water depths of 700 to 1,400 meters. The phased development includes the installation of stand-alone floating production storage and offloading (FPSO) facility and subsea infrastructure that will be designed to facilitate subsequent development phases. These options include potential gas export to Senegal and future subsea tie-backs to other fields.

WordPress Ads