Available in fibre counts from 192 to 576, the Sirocco Extreme cables benefit from the use of Prysmian’s PicoTube technology. December 28, 2021 Prysmian Group
The cable system consists of Nexans’ High Voltage Alternating Current (HVAC) cabling which will link the wind turbines to two offshore substation platforms (OSPs). The
The power transmission line is going to link Ghatampur thermal power station in Kanpur district to Hapur substation in western Uttar Pradesh. December 27, 2021
Nexans will utilise its Nexans Aurora vessel for the installation of the custom-made cable solution. The cable system consists of one 3-core 132kV AC cable
The tunnel communication system contract has been awarded by IRCON International Limited. The project includes works on the design, supply, testing, and commissioning of the